
MRVC has begun installing prefabricated vertical drains to strengthen soft ground before building embankments for the fifth and sixth lines.
MRVC plans 3.20 lakh metres of soil drains between Dahisar and Mira Road for the Borivali–Virar fifth and sixth line project.
A specialised machine is placing vertical drains in the soft ground between Dahisar and Mira Road, part of the Borivali–Virar fifth and sixth railway line project.
Mumbai Railway Vikas Corporation has planned around 3.20 lakh running metres of Prefabricated Vertical Drain (PVD) installation on this stretch. About 30,000 running metres have been completed so far, with the machine capable of installing roughly 3,000 running metres a day.
The drains create channels for water trapped in soft soil to escape, allowing the ground to settle and gain strength before railway embankments are constructed. MRVC says the method can achieve around 90% soil consolidation within six months under suitable conditions; natural consolidation can take several years.
The additional tracks are intended to separate suburban and long-distance train movements on the busy Western Railway corridor, where shared infrastructure can constrain operations. MRVC said it may deploy more machines depending on site availability and project needs.
GTK covers the news, people, culture, neighbourhoods, civic life and food shaping India’s cities. Better Starts With Us.