BMC begins ₹57.6 crore bridge repairs on Western Express Highway

BMC begins ₹57.6 crore bridge repairs on Western Express Highway

The civic body has begun tendering repairs to bridges, flyovers, foot overbridges and pedestrian subways from Bandra to Dahisar, with work planned over 18 months.

BMC has begun tendering repairs to bridges and pedestrian structures from Bandra to Dahisar, including bearings, cracks, joints, girders and barriers.

BMC has started the tender process for an approximately ₹57.6 crore programme to repair and strengthen bridges, flyovers, foot overbridges and pedestrian subways along the Western Express Highway from Bandra to Dahisar.

The work, approved by Municipal Commissioner Ashwini Bhide, is planned to take 18 months. It includes replacing bridge bearings, repairing concrete cracks and expansion joints, strengthening girders, dividers and parapet walls, and replacing deteriorated components.

BMC has earmarked ₹25.79 crore for Bandra, Santacruz, Vile Parle and Malad, and ₹31.81 crore for Kandivali, Borivali and Dahisar. Structures named for repairs include the Dahisar East Metro Station foot overbridge, Rawalpada foot overbridge, Dahisar River Bridge, Thakur Complex and Mahindra flyovers, Kalanagar and Bandra flyovers, Kherwadi flyover, Vakola pedestrian subway, Dindoshi flyover, Devipada pedestrian subway and Magathane foot overbridge.

BMC said it prioritised the structures after assessing their condition.

Latest stories

Cities

Sections

GTK covers the news, people, culture, neighbourhoods, civic life and food shaping India’s cities. Better Starts With Us.